Procore Release Notes

Last updated: Feb 9, 2026

  • Feb 13, 2026
    • Date parsed from source:
      Feb 13, 2026
    • First seen by Releasebot:
      Feb 9, 2026
    • Modified by Releasebot:
      Feb 14, 2026
    Procore logo

    Procore

    iOS - Modernized Multi-Column Tablet Experience for iPad

    Procore debuts a tablet‑first iPad experience with new multi‑column layouts for Documents, Drawings and Specifications, boosting field productivity. It adds instant photo location stamping and a wave of NGX UI upgrades across Change Events, Budgets, WBS, invoicing and admin settings for faster, clearer workflows.

    February 10, 2026

    Photos - Instant Location Stamping Enabled for Photos in Mobile Apps
    You can now instantly stamp your photos with the current location using the Stamp menu in the mobile app camera (iOS and Android). The currently set location is automatically added to any photo taken within the app. This location stamp feature ensures that every photo captured within the app includes precise location details, supporting traceability and reporting requirements.
    Previously, you exported photos manually and used third-party tools to add location labels. This workaround resulted in significant lost productivity. The new location stamp feature streamlines the process, saving time and reducing errors. Project stakeholders, including owners and municipal entities, can now reduce the time they spend on reporting. See Stamp a Photo with the Current Location (iOS) and Stamp a Photo with the Current Location (Android).

    February 9, 2026

    Change Events - Modernized Change Events Recycle Bin Experience
    Procore has modernized the Change Events Recycle Bin user interface with Next Generation Experience (NGX), delivering a modern, intuitive and high-performing experience. The new design is more consistent and user-friendly. There are no changes to the existing functionality.

    February 9, 2026

    Budget - Edit Budget Snapshots for greater flexibility
    You can now edit the name, type, and description of your budget snapshots directly from the Snapshot banner in the Budget. This update eliminates the need to delete and recreate snapshots when details change and allows you to convert snapshots between Ad Hoc and Project Status (PSS) types at any time, ensuring your data is correctly categorized for project or company-level reporting. Notably, converting to a PSS from Ad Hoc automatically sets the status to Approved, streamlining the transition for previously reviewed records. To learn more, see Budget and Snapshots User Guide.

    February 9, 2026

    WBS - Custom Segment Requirement Controls for Budget Codes
    Custom segments can now be configured as required for new budget codes in the Work Breakdown Structure. This update ensures consistency by enforcing field entry with visual indicators and error validation. Company Admins can enable this via the WBS segment settings to maintain data integrity across all projects. To learn more, see What is Work Breakdown Structure (WBS)?

    February 9, 2026

    Change Events - Modernized Change Events List View
    Procore has officially transitioned the Change Events list to a modernized view to make your experience faster and more intuitive. You can now see more information at a glance with descriptions placed directly under titles, while our new grouped filters make finding exactly what you need simpler than ever. Additionally, we’ve improved the performance to ensure a smoother experience. To learn how to use the Change Events tool, see Change Events.

    February 9, 2026

    WBS - Administrative WBS Enhancements
    Procore’s newest WBS enhancements streamline administrative workflows and provide stronger guardrails to ensure data integrity. Key updates include a new warning and acknowledgement for custom segment creation to ensure intentional segment setup, a cost code count column for subjobs, and the addition of required field asterisks and placeholder text for more visual clarity. These improvements, which also include "unsaved change" browser alerts and persistent action icons, provide a more intuitive environment with clearer guardrails for both Company and Project Admins.

    February 9, 2026

    Commitment - Automated Commitment Invoice Numbering
    Procore now offers a new company-level configuration to automatically number Commitment/Subcontractor Invoices, which simplifies the invoice management process across all projects. The "Automated Invoice Numbering," feature allows users to define a custom numbering format using components such as Invoice Position, Project Number, and Commitment Number, which can be previewed before implementation. The system ensures the format meets ERP requirements with character limits and is applied to all newly created invoices. To learn more, see Automated Commitment Invoice Numbering

    February 9, 2026

    Invoicing - Modernized Owner Invoice Change History
    Procore is introducing a modernized Owner Invoice Change History to improve customer experience and streamline invoicing processes. The Owner Invoice Change History now offers an updated interface, aligning with other financial tools and addressing previous usability challenges.

    February 9, 2026

    Project and Company Admin - Modernized Admin Settings for Contracts and Commitments
    Procore has modernized the Contract & Change Order Settings experience across Company and Project Admin to deliver a faster, more intuitive workflow. This enhancement brings Prime Contracts, Commitments, and Change Order Settings into our latest design system, ensuring a responsive interface and consistent navigation across the platform.

    Original source Report a problem
  • Feb 2, 2026
    • Date parsed from source:
      Feb 2, 2026
    • First seen by Releasebot:
      Jan 30, 2026
    • Modified by Releasebot:
      Feb 3, 2026
    Procore logo

    Procore

    Android - 2026.0128

    Procore releases a batch of updates including Sync Only Revenue Details for PCCO exports to Sage Intacct, CMiC, Vista, Viewpoint Spectrum, and Sage 300 CRE, plus Android 13 support and iOS fixes. New GovFed security, web Document Management markups, and Daily Log date picker enhance governance and usability.

    February 2, 2026

    Android - 2026.0128

    Update to support Android OS version 13 and above. Devices running Android OS version 11 and 12 will not receive future updates. See Android Requirements.

    January 30, 2026

    Sage Intacct® - Sync Only Revenue Details When Exporting PCCOs to Sage Intacct®

    Procore now allows you to sync revenue details only when exporting PCCOs for a project from Procore to Sage Intacct®. This feature helps you manage revenue details via PCCOs, while handling estimate details separately via Budget Changes. It is automatically enabled in your company accounts integrated with Sage Intacct®. See Things to Know - Sage Intacct®.

    CMiC - Sync Only Revenue Details When Exporting PCCOs to CMiC

    Procore now allows you to sync only revenue details when exporting PCCOs for a project from Procore to CMiC. This feature helps you manage revenue details via PCCOs, while handling estimate details separately via Budget Changes. It is automatically enabled in your company accounts integrated with CMiC. See Things to Know - CMiC.

    Vista® - Sync Only Revenue Details When Exporting PCCOs to Vista®

    Procore now allows you to sync only revenue details when exporting PCCOs for a project from Procore to Vista®. This feature helps you manage revenue details via PCCOs, while handling estimate details separately via Budget Changes. It is automatically enabled in your company accounts integrated with Vista®. See Things to Know - Vista®.

    iOS - 2026.0128

    Bug Fixes and Performance Improvements.

    Viewpoint® Spectrum® - Sync Only Revenue Details When Exporting PCCOs to Viewpoint® Spectrum®

    Procore now allows you to sync only revenue details when exporting PCCOs for a project from Procore to Viewpoint® Spectrum®. This feature helps you manage revenue details via PCCOs, while handling estimate details separately via Budget Changes. It is automatically enabled in your company accounts integrated with Viewpoint® Spectrum®. See Things to Know - Viewpoint® Spectrum®.

    Sage 300 CRE® - Sync Only Revenue Details When Exporting PCCOs to Sage 300 CRE®

    Procore now allows you to sync revenue details only when exporting PCCOs for a project from Procore to Sage 300 CRE®. This feature helps you manage revenue details via PCCOs, while handling estimate details separately via Budget Changes. It is automatically enabled in your company accounts integrated with Sage 300 CRE®. See Things to Know - Sage 300 CRE®.

    January 29, 2026

    Procore for Government Achieves FedRAMP® Moderate Authorization

    Procore for Government has achieved FedRAMP® Moderate Authorization. View the official listing on the FedRAMP Marketplace. Designed specifically for U.S. federal, state, local, tribal, and territorial entities, and their contractors that require government-grade security with a Moderate impact level, Procore for Government helps U.S. government agencies and their contractors collaborate on public sector construction projects. To learn more, see Procore for Government.

    Document Management: New Markup Functionality on Web

    Over the next ten days, Procore is rolling out significant enhancements to markup functionality in the web version of the Document Management tool. You can now categorize markups as public or private, and manage them independently of approval workflows. Instead of markups loading automatically when opening a document, choose your markups experience from the left-side panel: The layers icon opens the new ‘My Markups’ (private) and ‘Shared Markups’ (public) categories, and the workflow icon opens the same approval and markup functionality available previously. These updates offer a cohesive interface with improved filtering and organization for your annotations.

    January 27, 2026

    Daily Log - Added Date Picker to the Calendar View

    A new date picker has been added to the Calendar View page in the Daily Log tool (Web only). This enhancement allows you to quickly select specific dates, months, and years. It improves navigation, especially when accessing dates far in the past (for example, January 2025). It also enhances visibility and overall usability. The existing arrow buttons for adjacent month navigation are still available. See View Daily Logs in the Calendar View for more information.

    Original source Report a problem
  • All of your release notes in one place

    Join Releasebot and get updates from Procore and hundreds of other software products.

  • January 2026
    • No date parsed from source.
    • First seen by Releasebot:
      Jan 28, 2026
    Procore logo

    Procore

    Company Admin: MFE Update - Expense Allocations

    Procore is introducing a modernized, micro-frontend (MFE) architecture for the Expense Allocations pages within the Company Admin tool. This update provides an improved, more intuitive layout and a faster user experience. This change only affects the interface; all existing functionality remains the same.

    Original source Report a problem
  • Jan 23, 2026
    • Date parsed from source:
      Jan 23, 2026
    • First seen by Releasebot:
      Jan 23, 2026
    Procore logo

    Procore

    CMiC - Sync Schedule Impact Field on Prime Contract Change Orders

    Procore now allows CMiC users to sync the Schedule Impact field when exporting Prime Contract Change Orders (PCCOs) to CMiC. Values entered in the Schedule Impact field in a PCCO will now automatically populate the Days Impact field in an OCO, allowing for accurate tracking of scheduling impacts. This field is automatically synced with your company accounts integrated with CMiC. To learn more, see CMiC - Detailed Data Mapping.

    Original source Report a problem
  • Jan 22, 2026
    • Date parsed from source:
      Jan 22, 2026
    • First seen by Releasebot:
      Jan 13, 2026
    • Modified by Releasebot:
      Jan 23, 2026
    Procore logo

    Procore

    Company Timesheets - Close a Pay Period

    Procore rolls out a wave of NGX UI refreshes and mobile capabilities, from attaching documents in Correspondence to iOS Watchers and on‑the‑go PDM comparisons. Updates streamline payroll closing, disbursement flows, BIM Plugin unification, and modernized Docs and Specifications for a consistent web and mobile experience.

    January 22, 2026 — Company Timesheets - Close a Pay Period

    Timesheet administrators close a pay period to complete and lock all time entries. If employees submit timesheets late, the system notifies a distribution list, allowing administrators to see late entries, reduce compliance risks, and process payroll faster. See Configure Payroll Settings and Close a Pay Period .

    January 20, 2026 — Correspondence - Attach Document Management Files to Correspondence

    Procore introduced the ability for users to attach documents from the Document Management tool to items in the Correspondence tool on mobile devices. On both Android and iOS, the Correspondence tool enables seamless document attachment from PDM, supporting efficient project communication on the go. Learn, What is the difference between Document Management attachments and attachments from other tools?

    January 20, 2026 — Full page Disbursement Process

    Procore improved the Payments disbursement process by changing the creation flow from a side tear to a full-page view . The new experience retains all existing functionality, so disbursements are created, saved, and initiated the same way. See Create Disbursements .

    January 20, 2026 — Specifications - Modernized with New Data Table

    Procore updated the Specifications tool by replacing the old data table with a modern NGX data table, delivering a refreshed look and improved consistency with other Procore tools. The Specifications tool now features a more intuitive and less cluttered interface, with no loss or significant change in functionality.

    January 20, 2026 — Company and Project Documents - Modernized List View

    Procore updated both the Company and Project Documents tool by replacing the old data table and info pages with a new data table and unified info panel, delivering a modernized user interface aligned with NGX design patterns. The Documents tool adopted a more intuitive and consistent look and feel, with no loss or significant change in functionality.

    January 20, 2026 — Procore BIM Plugin 1.3.0

    Procore is streamlining the publishing workflow by migrating the Model Publish and Settings buttons from the VDC Plugin into a unified Procore BIM Plugin. This v1.3.0 release provides a consistent user interface across both web and Navisworks, designed for a seamless experience through a single installer. For more information, see Procore BIM Plugin: Consolidation & Update History .

    January 20, 2026 — Modernized Company App Management List Page

    Procore updated Company Level App Management to deliver a more modern and intuitive user interface. The modernized App Management List now uses a new architecture and features a refreshed design that aligns with Procore’s latest standards and maintains all existing functionality.

    January 20, 2026 — BIM Coordination Issues - Watchers Functionality Now Available on iOS

    The Watchers feature for the BIM Coordination Issues tool is now available on iOS. Field teams can now add and remove Watchers directly from their mobile devices. For details, see Add Watchers to Coordination Issues (iOS) .

    January 20, 2026 — Document Management - Document Comparison for Mobile

    Procore introduced document comparison capabilities on Mobile PDM for both iOS and Android devices, enabling users to identify differences between documents using Tabbed View and Overlay View. The document comparison feature allowed users to compare any revision or version of the same document, as well as other documents within the same PDM collection, streamlining workflows for both office and field teams.

    January 20, 2026 — Specifications - Info Page Modernization

    Procore updated the Specifications tool by replacing the old info page with a new, modernized version that aligns with NGX design patterns. The Specifications tool info page adopted a refreshed layout, offering a more intuitive and consistent user experience without any loss of functionality.

    Original source Report a problem
  • Jan 12, 2026
    • Date parsed from source:
      Jan 12, 2026
    • First seen by Releasebot:
      Jan 15, 2026
    Procore logo

    Procore

    iOS - 2026.0105

    Bug Fixes and Performance Improvements.

    Original source Report a problem
  • Jan 7, 2026
    • Date parsed from source:
      Jan 7, 2026
    • First seen by Releasebot:
      Jan 8, 2026
    Procore logo

    Procore

    Procore BIM Plugin 1.2.1

    January 7, 2026

    Procore BIM Plugin 1.2.1

    • Fixed angled section plane application within the coordination issue viewpoint.
    • Resolved missing Navisworks® Saved Viewpoints in the Coordination Issues Import Viewpoints dialog.
    • Fixed missing Procore icons for clashes in Navisworks® 2026.
    Original source Report a problem
  • Dec 24, 2025
    • Date parsed from source:
      Dec 24, 2025
    • First seen by Releasebot:
      Jan 7, 2026
    Procore logo

    Procore

    Procore Imports 1.6.2

    Procore Imports 1.6.2

    • Added support for three new languages: Portuguese (Portugal), Chinese Traditional (Taiwan), and Norwegian Bokmål.
    • Fixed connection issue to Procore for Government.
    Original source Report a problem
  • Dec 24, 2025
    • Date parsed from source:
      Dec 24, 2025
    • First seen by Releasebot:
      Dec 17, 2025
    • Modified by Releasebot:
      Jan 6, 2026
    Procore logo

    Procore

    Procore Imports 1.6.2

    Procore Imports 1.6.2 adds Portuguese (Portugal), Chinese Traditional, and Norwegian Bokmål plus fixes a Procore Government connection. The December 2025 release modernizes Admin screens, enables Watchers for BIM issues, and refreshes Assignment, Bidding, Daily Log, and Insights experiences across the platform.

    Procore Imports 1.6.2

    • Added support for three new languages: Portuguese (Portugal), Chinese Traditional (Taiwan), and Norwegian Bokmål.
    • Fixed connection issue to Procore for Government.

    December 18, 2025

    Company and Project Admin - Modernized Pages

    Procore is modernizing three screens across the Company and Project Admin tools for optimized performance and design. In the Company Admin tool, the Roles and Contextual Help pages have updated user interfaces, and in the Project Admin tool, you’ll notice a more modern Settings page if you have the ‘Project Overview’ Beta experience enabled via Procore Explore.

    Enhanced Issue Awareness with Watchers for BIM Coordination Issues

    Procore introduced the Watchers field to the Coordination Issues tool, enabling project teams to efficiently receive automated notifications about relevant issues without relying on manual comment tagging or email chains. Coordination Issue creators can add key stakeholders (like BIM Leads or Project Managers) as Watchers upon creation to ensure they are kept in the loop from the start. To learn more, see Add Watchers to Coordination Issues.

    December 17, 2025

    Resource Planning - Modernized Experience for the Assignments List

    The new assignment list and details pages are efficient and easy to use. Users can now see project and people information directly on the list page, eliminating the need to navigate away. You can also configure filters, bulk update data, and sort every column easily. See View the Assignments List.

    December 16, 2025

    Consistent User Experience with Bidding

    This release modernizes individual Bidding Tool pages to align with Procore’s latest design standards, improving usability and streamlining workflows. Key updates include redesigned navigation and filters for bid packages, enhanced correspondence creation with a new text editor, and improved email and Planroom experiences. These changes are part of Procore’s Bidding Tool Modernization initiative, aimed at delivering a more intuitive, efficient, and unified communication platform for construction stakeholders.

    Daily Log - Added Anchor Navigation Menu for Enhanced Usability

    Procore has added a new anchor navigation menu to the List view in the Daily Log tool (web only). This menu allows you to quickly navigate between individual log types on the List view page without excessive scrolling. It displays all log types as clickable links (based on Project and Company settings) and remains visible on the left side of the List view page while scrolling. This enhancement also provides a cleaner and more structured interface (Web), improving overall usability. See View a Daily Log in the List View.

    Insights - User Engagement Insight Now Available

    Procore has introduced new user engagement insights by aggregating user activity data such as last log in, average interaction metrics, and session durations. The User Engagement insight enables project managers and administrators to identify both high and low usage users, supporting targeted actions to improve team productivity and system utilization. See About Procore Insights to learn more.

    Enhanced Field Descriptions for Directory Data Set in 360 Reporting

    To improve data clarity in 360 Reporting, Procore has added comprehensive descriptions for all Directory data set fields. Users can now hover over a new information icon next to data set fields to instantly see a clear explanation of what the field represents. This helps users create reports with greater speed and confidence. See Create a Company 360 Report and Create a Project 360 Report.

    Insights - General Availability Across All Regions and Languages

    Procore Insights has expanded access to all regions and supported languages. Construction Intelligence Insights enable global deployment, consistent time zone and currency handling, retrained RFI topic models, and region-specific benchmarks for enhanced predictive analytics. See About Procore Insights.

    Bidding Usability Improvements

    We have enhanced efficiency in the Bidder Tab by enabling instant search capabilities by Bidder first name, last name, and company name. Solicitors can now bypass time-consuming filters and scrolling, making it quicker and easier to locate specific bidders instantly. See Search for and Filter Bidders on a Bid Form.

    Original source Report a problem
  • Dec 16, 2025
    • Date parsed from source:
      Dec 16, 2025
    • First seen by Releasebot:
      Dec 16, 2025
    Procore logo

    Procore

    New Unified Procore BIM Plugin and Grid Export from Revit

    Procore is simplifying your toolset by combining legacy VDC plugins into one powerful Procore BIM Plugin for Autodesk®. In this initial release, you will experience a modernized interface designed to match the Procore Coordination Issues web app for a seamless transition between platforms. This update also introduces the highly requested ability to export grids directly from Revit®. To learn more, see Procore BIM Plugins and Export Grids from Autodesk® Revit® to a Model in Procore.

    Original source Report a problem

Related vendors